Q:

How soon I can sealcoat a freshly laid asphalt?


A:

As soon as the surface rids of light oils, through oxidation. To ensure spread some water on the surface. It the water spread evenly without beading, you are ready. It is also called "water break test". It usually takes about 4-6 weeks, depending on geographical locations.